The cost of development
of the project documentation (working draft) on every kind of facilities depends
on a wide range of factors.
For example, for filling
stations and service station and convenience retailing the cost of
the design works mainly depends on the following characteristics:
type: a traditional
filling station, a LHG filling station or a wide-range filling station;
number of kinds of fuel;
number of
fuel-dispensing units;
capacity
of a tank farm and number of tanks;
availability
and content of accompanying buildings and constructions (extended operator’s
shack, availability of a shop, a service station or a car wash, sewage disposal
plants and so on);
development
on additional parts of the project (Construction method statement and Project
for implementation of construction operations, Publicly owned treatment works,
Civil Defense and Emergency Situations, Environmental Protection);
Below there are the
prices for the design of filling stations in a standard list of equipment:
→ Base value of design of a filling
station is 600000 rubles.
→ Base value of design of a LHG
filling station is 600000 rubles.
→ Base value of design of a wide-range filling station
is 900000 rubles.
The cost of the project
on construction of the facilities of oil products storage and transfer (tank
farms, oil products active storage, LHG storage buildings etc.) depends on the
following characteristics:
Number and kinds of oil products
(oil, fuel oil, petroleum, diesel fuel oil, liquefied hydrocarbon gas,
solvents, individual hydrocarbons and so on);
Capacity of a tank farm,
number of tanks and their type;
Ways of oil products
acceptance and shipment (railway, automobile, pipeline, marine transport); number
of points for loading and unloading;
Characteristic features
of complexity of the functional diagram
The more complicated
functionally and structurally the object,. the more difficulties one will face
when determining a should cost (both from the point of view of the Customer and
the Executor) of its design, - as there are a lot of characteristics and
factors which could have a great impact on the production cost of the project
design (and on the project price as a whole accordingly). Therefore the
discussion on a final agreed cost should be conducted only after a
comprehensive consideration of the items and making up a design task order.
The main factors which
influence the design and construction cost of a refinery (mini-refinery):
Capacity of a raw material unit ;
Characteristics (kind and quality) of a would-be raw material (gas
condensate, blend crude oil (prepared partially or crude oil), sour oil or
sweet oil etc.);
Characteristics (quality and benchmarks) of the output (accordance with
GOST -standards, EURO-standards, etc.) processing depth;
Output assortment (apart from petroleum, diesel fuel oil, fuel oil);
Characteristics (capacity and content) of a tank farm (correlation with the units parameters).
There is a price-list of LLC “Specialized Constructive Bureau” on making design works and an appropriate methodology for the
calculations which are the basis for determination of the design works cost taking
into consideration the Customer’s demands and wishes.
Attention!
To put forward a
commercial proposal on the performance of the design works we ask You to call
us or to make an enquiry on a headed paper by e-mail or by fax with the
description of the root of the matter, Your organization’s notification
addresses, technical characteristics of the facility. Furthermore (if there is
a necessity) we shall send You a material requisition to set tasks and
objectives to a fuller extent.
We shall ignore the
enquiries which lack the following information:
1)Name of
the organization, full name of a representative or a private person;
2)Contact
information (telephone, e-mail);
3)Information
on the facility location (region, urban conglomeration);
4)Information
on the stage of a capital spending project, information on the technical conditions,
permissions and documents for the site;
5)A
detailed description of the facility required characteristics;
6)Information
on the required dates of the project implementation.